Checklists for Homestead
Pick your job to jump to its checklist.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
- All official forms
Not sure if you need a permit? Use the "Do I need a permit?" tool.
Steps to get a permit
- Apply online in the city's B.U.I.L.D. portal. Official source: City of Homestead: B.U.I.L.D. portal (opens in a new tab)
- Pay any up-front fee. The city accepts the application only after that.
- Upload the drawings and a signed, notarized application. Remote online notary is accepted.
- Name every file with the city's naming rules. Files with wrong names get rejected. Official source: City of Homestead: file naming rules (EPL Naming Conventions) (opens in a new tab)
- Leave a blank box in the top-right corner of every plan page for the city stamp: 2x2 inches on letter size, 3x3 on 11x17, 4.5x4.5 on large sheets.
- The first review takes about 14 business days. Corrections come by email from eplnotifications@homesteadfl.gov.
- Fix the plans and send the full set for that trade again.
- Pay the final permit fees online.
- Download the approved plans. Keep a stamped set at the job site.
- Some jobs also need Miami-Dade County approval (environment office DERM, Water and Sewer WASD, impact fees). Official source: Miami-Dade County: online permit services (opens in a new tab); Miami-Dade Municipal Permit Application (opens in a new tab)
- Projects started before 1 Oct 2025 stay in the old system (Community Plus).
- State law: for some jobs under $15,000 on an existing single-family home, the city must decide within 5 business days. Official source: Florida Building Commission: HB 803 summary (opens in a new tab)
Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)
The $7,500 exemption
- Since 1 July 2026, a single-family homeowner, or their contractor, does not need a building permit for work worth less than $7,500. Official source: Florida Senate: HB 803 (2026) (opens in a new tab)
- It does NOT cover electrical, plumbing, structural, mechanical (air conditioning) or gas work. It does NOT apply in a flood hazard area. You cannot split one job into smaller jobs. Official source: Florida Building Commission: HB 803 summary (opens in a new tab)
- You still must send the city a written request with a copy of the contract. Homestead's form is the "Building Permit Exemption Request". Official source: Building Permit Exemption Request ($7,500 rule) (opens in a new tab)
- The signatures must be notarized. A contractor can sign as the owner's agent if the contract allows it.
- The same form also covers temporary flood panels outside flood zones.
- The form prints the phone number 305-244-4500. That looks like a typo. The Building Department number is 305-224-4500. Official source: City of Homestead: Building Department directory (opens in a new tab)
- How to send the form to the city: we could not confirm this. Check with the city.
Doing the work yourself (owner-builder)
- You can do the work yourself on a home you own and live in, within the limits of Miami-Dade County Code Chapter 10. Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
- You must take a test with the Building Official. Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
- You must sign the Owner/Builder Affidavit. Official source: Owner/Builder Affidavit (opens in a new tab)
- The home must be for your own use, not for sale or rent. If you sell or rent it within 1 year, the law assumes you built it to sell. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
- You must supervise the work in person, at the job site. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
- You must go in person and sign the permit application. Filing online is only allowed for some solar jobs. So owner-builders cannot simply file from an app. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
- You must sign a statement that says you are legally and financially responsible. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
Using a contractor
- Contractors must register with the city before they can apply. Official source: City of Homestead: B.U.I.L.D. portal questions (FAQ) (opens in a new tab); Contractor Licensing Registration form (opens in a new tab)
- The owner can sign the application, or sign a "Permit Authorization" naming the contractor as agent (this is from Homestead's carport checklist). Official source: Checklist: Carports (opens in a new tab)
- Homestead has a "Property Owner Written Authorization" form. What it covers exactly: check with the city. Official source: Property Owner Written Authorization (opens in a new tab)
- The contractor registration form lets a qualifier name a person the city may release permits to. Official source: Contractor Licensing Registration form (opens in a new tab)
- Many Homestead forms need notarized signatures of the owner and the qualifier.
Notice of Commencement
- A Notice of Commencement must be filed before the first inspection when the contract is more than $5,000.
- Air conditioning repair or replacement under $15,000 does not need one.
- The city cannot require the Notice of Commencement before it issues the permit.
Official source: Florida Statutes 713.135 (Notice of Commencement) (opens in a new tab)
Inspections and the end of the job
- Book inspections online in the portal, or by phone at 305-224-4500. Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)
- Another city page gives 305-224-4590. Which number is current: check with the city. Official source: City of Homestead: inspection questions (FAQ) (opens in a new tab)
- At the end you get a Certificate of Occupancy (new buildings, change of use) or a Certificate of Completion (remodels). Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)
- How long is a permit good for? State law (2026) says single-family permits last 1 year. Homestead's FAQ still says 180 days. Check with the city. Official source: Florida Building Commission: HB 803 summary (opens in a new tab); City of Homestead: building questions (FAQ) (opens in a new tab)
Fees
- These come from the city's fee schedule adopted 9 Sept 2025. The city's table is hard to read. Confirm every amount with the city.
- Remodels and alterations: 3.0% of the job value.
- New homes: 2.0% of the job value. Business and apartment buildings: 2.28%.
- Up-front application fee: $125 minimum plus 1.5% of the value for most jobs ($288 for a new single-family home or duplex up to 2,000 sq ft; $575 for new commercial up to 1,500 sq ft). It counts toward the final permit fee.
- Plan review: $116 per review round for building, mechanical, electrical and plumbing; $140 for structural.
- Added on top: state surcharges of 1.0% and 1.5% of the permit fee, and a Miami-Dade surcharge of $0.60 per $1,000 of work value.
- Change to an open permit: $100 plus 10% of the permit fees.
- Re-roof, water heater, AC change-out, shed, generator, re-inspection and extension fees: check with the city.
Official source: City of Homestead: Building Division fee schedule (adopted Sept 2025) (opens in a new tab)
All official forms
The city says the old PDF application forms are only for older (before Oct 2025) or non-portal applications. New applications go through the B.U.I.L.D. portal.
- Permit Application (old form: only for pre-Oct 2025 or non-portal cases) (opens in a new tab)
- Owner/Builder Affidavit (opens in a new tab)
- Building Permit Exemption Request ($7,500 rule) (opens in a new tab)
- Property Owner Written Authorization (opens in a new tab)
- Air Conditioning Change Out Data Form (opens in a new tab)
- Window Door Shutter Affidavit (opens in a new tab)
- Construction Cost Affidavit (opens in a new tab)
- Fence Application Addendum (opens in a new tab)
- Fence details: aluminum (opens in a new tab)
- Fence details: chain link (opens in a new tab)
- Fence details: wood (opens in a new tab)
- Roofing Package, Residential (opens in a new tab)
- Swimming Pool Barrier Certification (opens in a new tab)
- Workers Comp Insurance Exemption (opens in a new tab)
- Request for Information (permit records) (opens in a new tab)
- Miami-Dade Municipal Permit Application (opens in a new tab)
- Contractor Licensing Registration form (opens in a new tab)
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Roof
Homestead has a roof checklist and a residential roofing package. Expect a permit. Re-roof fee: check with the city.
Official city checklists
Official city forms
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Windows or shutters
Homestead has checklists for windows, doors and shutters, and a Window Door Shutter Affidavit. Changing only the glass: check with the city.
Official city checklists
Official city forms
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Doors
Homestead has a windows and doors checklist. A door with its frame needs a permit in Miami-Dade County; changing only the door slab: check with the city.
Official city checklists
Official city forms
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Fence
Homestead has a fence checklist, a fence addendum and fence detail sheets. Expect a permit.
Official city checklists
Official city forms
- Fence Application Addendum (opens in a new tab)
- Fence details: aluminum (opens in a new tab)
- Fence details: chain link (opens in a new tab)
- Fence details: wood (opens in a new tab)
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Shed
Homestead has a shed checklist. Expect a permit. Shed fee: check with the city.
Official city checklists
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Air conditioning (AC) change-out
Air conditioning is mechanical work. It always needs a permit in Homestead. Under $15,000: no Notice of Commencement. AC fee: check with the city.
Official city checklists
Official city forms
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Water heater
Plumbing or gas work needs a permit in Homestead. A small electric heater (50 gallons or less, licensed plumber) needs no permit in Miami-Dade County: check with the city. Water heater fee: check with the city.
No job-specific city checklist was found. Use the general steps below.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
Electrical work
Electrical work always needs a permit in Homestead. The $7,500 rule does not cover it.
No job-specific city checklist was found. Use the general steps below.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
Plumbing
Plumbing work always needs a permit in Homestead. The $7,500 rule does not cover it.
No job-specific city checklist was found. Use the general steps below.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
Pool
Homestead has a pool checklist and a Swimming Pool Barrier Certification. Any pool electrical work needs a permit.
Official city checklists
Official city forms
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Driveway or pavers
Homestead has driveway and slab checklists. Expect a permit for a driveway. Walkways and pavers: check with the city.
Official city checklists
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Solar panels
No Homestead solar page was found. Solar is electrical work, so expect a permit. Check with the city.
No job-specific city checklist was found. Use the general steps below.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
Paint or colors
State law: a city may not require a permit to paint a home. Painting a business building: Homestead lists a "paint permit for non-residential structure". Colors and HOA rules: check.
No job-specific city checklist was found. Use the general steps below.
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
Inside remodel
Homestead has a repairs and alterations checklist. Redecorating and minor repairs need no permit. Moving walls, pipes or wires needs a permit.
Official city checklists
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)
Other job
Homestead also has checklists for additions, screen enclosures, carports, slabs and demolition. If your job is not listed, call the city.
Official city checklists
- Checklist: Repairs and Alterations (opens in a new tab)
- Checklist: Residential Additions (opens in a new tab)
- Checklist: Screen Enclosure (opens in a new tab)
- Checklist: Carports (opens in a new tab)
- Checklist: Slabs (opens in a new tab)
- Checklist: Demolition (opens in a new tab)
For every job, also read:
- Steps to get a permit
- The $7,500 exemption
- Doing the work yourself (owner-builder)
- Using a contractor
- Notice of Commencement
- Inspections and the end of the job
- Fees
Official source: City of Homestead: Forms and Documents (opens in a new tab)