Checklists for Homestead

Pick your job to jump to its checklist.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees
  8. All official forms

Not sure if you need a permit? Use the "Do I need a permit?" tool.

Steps to get a permit

  1. Apply online in the city's B.U.I.L.D. portal. Official source: City of Homestead: B.U.I.L.D. portal (opens in a new tab)
  2. Pay any up-front fee. The city accepts the application only after that.
  3. Upload the drawings and a signed, notarized application. Remote online notary is accepted.
  4. Name every file with the city's naming rules. Files with wrong names get rejected. Official source: City of Homestead: file naming rules (EPL Naming Conventions) (opens in a new tab)
  5. Leave a blank box in the top-right corner of every plan page for the city stamp: 2x2 inches on letter size, 3x3 on 11x17, 4.5x4.5 on large sheets.
  6. The first review takes about 14 business days. Corrections come by email from eplnotifications@homesteadfl.gov.
  7. Fix the plans and send the full set for that trade again.
  8. Pay the final permit fees online.
  9. Download the approved plans. Keep a stamped set at the job site.
  10. Some jobs also need Miami-Dade County approval (environment office DERM, Water and Sewer WASD, impact fees). Official source: Miami-Dade County: online permit services (opens in a new tab); Miami-Dade Municipal Permit Application (opens in a new tab)
  11. Projects started before 1 Oct 2025 stay in the old system (Community Plus).
  12. State law: for some jobs under $15,000 on an existing single-family home, the city must decide within 5 business days. Official source: Florida Building Commission: HB 803 summary (opens in a new tab)

Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)

Back to the job list

The $7,500 exemption

  1. Since 1 July 2026, a single-family homeowner, or their contractor, does not need a building permit for work worth less than $7,500. Official source: Florida Senate: HB 803 (2026) (opens in a new tab)
  2. It does NOT cover electrical, plumbing, structural, mechanical (air conditioning) or gas work. It does NOT apply in a flood hazard area. You cannot split one job into smaller jobs. Official source: Florida Building Commission: HB 803 summary (opens in a new tab)
  3. You still must send the city a written request with a copy of the contract. Homestead's form is the "Building Permit Exemption Request". Official source: Building Permit Exemption Request ($7,500 rule) (opens in a new tab)
  4. The signatures must be notarized. A contractor can sign as the owner's agent if the contract allows it.
  5. The same form also covers temporary flood panels outside flood zones.
  6. The form prints the phone number 305-244-4500. That looks like a typo. The Building Department number is 305-224-4500. Official source: City of Homestead: Building Department directory (opens in a new tab)
  7. How to send the form to the city: we could not confirm this. Check with the city.

Back to the job list

Doing the work yourself (owner-builder)

  1. You can do the work yourself on a home you own and live in, within the limits of Miami-Dade County Code Chapter 10. Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
  2. You must take a test with the Building Official. Official source: City of Homestead: building questions (FAQ) (opens in a new tab)
  3. You must sign the Owner/Builder Affidavit. Official source: Owner/Builder Affidavit (opens in a new tab)
  4. The home must be for your own use, not for sale or rent. If you sell or rent it within 1 year, the law assumes you built it to sell. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
  5. You must supervise the work in person, at the job site. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
  6. You must go in person and sign the permit application. Filing online is only allowed for some solar jobs. So owner-builders cannot simply file from an app. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)
  7. You must sign a statement that says you are legally and financially responsible. Official source: Florida Statutes 489.103 (owner-builders) (opens in a new tab)

Back to the job list

Using a contractor

  1. Contractors must register with the city before they can apply. Official source: City of Homestead: B.U.I.L.D. portal questions (FAQ) (opens in a new tab); Contractor Licensing Registration form (opens in a new tab)
  2. The owner can sign the application, or sign a "Permit Authorization" naming the contractor as agent (this is from Homestead's carport checklist). Official source: Checklist: Carports (opens in a new tab)
  3. Homestead has a "Property Owner Written Authorization" form. What it covers exactly: check with the city. Official source: Property Owner Written Authorization (opens in a new tab)
  4. The contractor registration form lets a qualifier name a person the city may release permits to. Official source: Contractor Licensing Registration form (opens in a new tab)
  5. Many Homestead forms need notarized signatures of the owner and the qualifier.

Back to the job list

Notice of Commencement

  1. A Notice of Commencement must be filed before the first inspection when the contract is more than $5,000.
  2. Air conditioning repair or replacement under $15,000 does not need one.
  3. The city cannot require the Notice of Commencement before it issues the permit.

Official source: Florida Statutes 713.135 (Notice of Commencement) (opens in a new tab)

Back to the job list

Inspections and the end of the job

  1. Book inspections online in the portal, or by phone at 305-224-4500. Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)
  2. Another city page gives 305-224-4590. Which number is current: check with the city. Official source: City of Homestead: inspection questions (FAQ) (opens in a new tab)
  3. At the end you get a Certificate of Occupancy (new buildings, change of use) or a Certificate of Completion (remodels). Official source: City of Homestead: Guide to Getting a Building Permit (opens in a new tab)
  4. How long is a permit good for? State law (2026) says single-family permits last 1 year. Homestead's FAQ still says 180 days. Check with the city. Official source: Florida Building Commission: HB 803 summary (opens in a new tab); City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Fees

  1. These come from the city's fee schedule adopted 9 Sept 2025. The city's table is hard to read. Confirm every amount with the city.
  2. Remodels and alterations: 3.0% of the job value.
  3. New homes: 2.0% of the job value. Business and apartment buildings: 2.28%.
  4. Up-front application fee: $125 minimum plus 1.5% of the value for most jobs ($288 for a new single-family home or duplex up to 2,000 sq ft; $575 for new commercial up to 1,500 sq ft). It counts toward the final permit fee.
  5. Plan review: $116 per review round for building, mechanical, electrical and plumbing; $140 for structural.
  6. Added on top: state surcharges of 1.0% and 1.5% of the permit fee, and a Miami-Dade surcharge of $0.60 per $1,000 of work value.
  7. Change to an open permit: $100 plus 10% of the permit fees.
  8. Re-roof, water heater, AC change-out, shed, generator, re-inspection and extension fees: check with the city.

Official source: City of Homestead: Building Division fee schedule (adopted Sept 2025) (opens in a new tab)

Back to the job list

All official forms

The city says the old PDF application forms are only for older (before Oct 2025) or non-portal applications. New applications go through the B.U.I.L.D. portal.

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Roof

Homestead has a roof checklist and a residential roofing package. Expect a permit. Re-roof fee: check with the city.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Windows or shutters

Homestead has checklists for windows, doors and shutters, and a Window Door Shutter Affidavit. Changing only the glass: check with the city.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Doors

Homestead has a windows and doors checklist. A door with its frame needs a permit in Miami-Dade County; changing only the door slab: check with the city.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Fence

Homestead has a fence checklist, a fence addendum and fence detail sheets. Expect a permit.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Shed

Homestead has a shed checklist. Expect a permit. Shed fee: check with the city.

Official city checklists

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Air conditioning (AC) change-out

Air conditioning is mechanical work. It always needs a permit in Homestead. Under $15,000: no Notice of Commencement. AC fee: check with the city.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Water heater

Plumbing or gas work needs a permit in Homestead. A small electric heater (50 gallons or less, licensed plumber) needs no permit in Miami-Dade County: check with the city. Water heater fee: check with the city.

No job-specific city checklist was found. Use the general steps below.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Electrical work

Electrical work always needs a permit in Homestead. The $7,500 rule does not cover it.

No job-specific city checklist was found. Use the general steps below.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Plumbing

Plumbing work always needs a permit in Homestead. The $7,500 rule does not cover it.

No job-specific city checklist was found. Use the general steps below.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Pool

Homestead has a pool checklist and a Swimming Pool Barrier Certification. Any pool electrical work needs a permit.

Official city checklists

Official city forms

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Driveway or pavers

Homestead has driveway and slab checklists. Expect a permit for a driveway. Walkways and pavers: check with the city.

Official city checklists

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Solar panels

No Homestead solar page was found. Solar is electrical work, so expect a permit. Check with the city.

No job-specific city checklist was found. Use the general steps below.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Paint or colors

State law: a city may not require a permit to paint a home. Painting a business building: Homestead lists a "paint permit for non-residential structure". Colors and HOA rules: check.

No job-specific city checklist was found. Use the general steps below.

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: building questions (FAQ) (opens in a new tab)

Back to the job list

Inside remodel

Homestead has a repairs and alterations checklist. Redecorating and minor repairs need no permit. Moving walls, pipes or wires needs a permit.

Official city checklists

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list

Other job

Homestead also has checklists for additions, screen enclosures, carports, slabs and demolition. If your job is not listed, call the city.

Official city checklists

For every job, also read:

  1. Steps to get a permit
  2. The $7,500 exemption
  3. Doing the work yourself (owner-builder)
  4. Using a contractor
  5. Notice of Commencement
  6. Inspections and the end of the job
  7. Fees

Official source: City of Homestead: Forms and Documents (opens in a new tab)

Back to the job list